Pecan Springs Elementary students are learning in a rebuilt school in East Austin funded by Austin ISD's $2.44 billion 2022 bond. The new campus replaces a building that opened in 1957. District leaders celebrated the $47.66 million modernization with a ribbon-cutting Nov. 19.
The details: The new school includes a modernized library, gym and cafeteria; art studios; and “learning neighborhoods” with collaboration spaces and makerspaces, according to AISD.
District officials said the campus was designed to be flexible and support different learning styles. At the December 2024 groundbreaking, Principal Andrea Williams said nature and the four seasons inspired some of the learning areas.
How we got here: Construction crews tore down the original campus and built a new school on the same site at 3210 Rogge Lane.
During construction, students attended classes in portable buildings at Winn Montessori Elementary. They moved into the new campus at the start of the fall 2026 semester, per the district.