A Texas A&M study of Clear Creek revealed over 16.7 million cubic yards of accumulated sediment and thousands of hazardous objects obstructing the waterway.
The city of Friendswood, which is pierced by Clear Creek, is identifying ways to fund ongoing projects that will mitigate flooding and debris in the city’s waterways.
The details: The Harris County Flood Control District, or HCFCD, received bids in October for construction of a regional stormwater basin, which will be located near the intersection of Blackhawk Boulevard and FM 1959, Blackburn said.
While the basin’s construction is slated to begin in early 2027, Blackburn said the Galveston County Consolidated Drainage District had withdrawn its financial commitment to the $32 million project.
What else: Council member Robert Griffon presented findings from a study conducted by the Disaster Data Reconnaissance Center at Texas A&M University which found thousands of pieces of debris in Clear Creek. According to the study, 80% of the sediment can be attributed to storm events and 20% to construction runoff.