|
Around San Antonio, transportation projects are underway or in development, causing traffic delays as roads expand and improve to handle traffic demands. Here are five transportation projects across the northern areas of the metro.
I-10 and Loop 1604 interchange project: Part of the Loop 1604 North Expansion Project, the Loop 1604 and I-10 interchange project will consist of eight flyover ramps, roundabouts, a high-occupancy vehicle lane and other interchange improvements, according to the Texas Department of Transportation. TxDOT opened the eighth and final flyover ramp Feb. 5, connecting westbound Loop 1604 to westbound I-10. Known as Segment 2, the interchange is 65% done.
FM 1518: Traffic on FM 1518 between I-10 and the Woman Hollering Creek bridge shifted to the east in March. In April, TxDOT began drainage installations at Ray Corbett Drive and other road sections. During construction, two-way traffic along FM 1518 will be maintained. This configuration is expected to be in place until winter 2026.
|